Both of us finally caved in to the pressure of having a pool built in our backyard! This was not going to be any familiar pool, it was going to have a natural look which meant it would be surrounded by natural rock, it would also have a slide for the children and a lazy river, maybe after that I could get our children to spend more time at new home and it would also provide us a commonplace for all of us to hang out.
The project would take close to 6 months to complete.
I was present when they were installing the new heating machine for the pool since it would be a heated pool. It reminded me of some years back when we had visited a new home services supplier to consult on the best heating and A/C for our home. After a discussion with the heating corporation, we had settled for a dual fuel system. The electric heat pump was great for saving energy while the gas furnace would help with indoor comfort, especially during winter season. The system had not given us any trouble since because we also upgraded the furnace filter on time and we never neglected to have a heating corporation come for a furnace/heater tune-up and heat pump service. The same heating company was the same one who had worked on our gas fireplace and installed a digital control machine when we were renovating the house.